Gates desanding chambers Central Tel

image3

Gates desanding chambers Central Tel

Main object of the work:

  • Supply and installation of No.2 3000x4000mm 6m H2O sluice gates including No.2 gargoyles, sill and mechanism holders for sluice gates, threaded operating rods and gearbox drive system and electromechanical actuator
  • Supply and installation of No. 2 access walkways to maneuvering floors
  • Overhaul with supply and installation of maneuvering mechanisms for adaptation of No. 2 low desander gates
  • Overhaul with supply and installation of maneuvering mechanisms for adaptation of 2 high desander gates
  • Overhaul with supply and installation of maneuvering mechanism for adaptation of No. 1 side channel desander sluice gate
  • Overhaul with supply and installation of maneuvering mechanism for adaptation of No. 1 sluice gate discharge desander
  • Engineering and CND on the supply