Hydroelectric power plant 250 kW, Navigliaccio 2

Hydroelectric power plant 250 kW, Navigliaccio 2Supply and installation of the electromechanical works of the hydroelectric plant as follows:TurbinesN.1 Two-stage 250 kW Kaplan turbine complete with asynchronous alternatorElectromechanical equipmentN.1 DN1400 PN6 butterfly valveN.1 Hydraulic...
  • By geminit
  • 24 Settembre 2024

55 kW auger

55 kW augerSupply and installation of an auger for power generation with the following characteristic data:Auger diameter: 3.0 mTotal length: 7.2 mGenerator power: 55kW 
  • By geminit
  • 24 Settembre 2024

Impianto a coclea da 60 kW

60 kW auger plantSupply and installation of a power generation screw with the following characteristic data:Nominal flow rate 1.0 m^3/sSkip: 7.88 mAuger diameter: 1.80 mTotal length: 16.9 mGenerator power: 60kWWith the following accessories:Hydraulic machine...