Portfolio Categories: floodgates

  • By geminit
  • 4 Ottobre 2024

Maintenance of bottom drains and sluice gates

AISI 316L sluice gates St. Mark's Square VeniceMain object of the work:Supply, transport and installation of 8 new diaphragms 2000x2000mm in carbon steel and neoprene seal, protected by epoxy cycleSupply, transport and installation of...
  • By geminit
  • 4 Ottobre 2024

Maintenance sluice gates Water

Floodgates AISI 316L Piazza San Marco Venice Main object of the work:          Supply, transport and installation of 8 new diaphragms 2000x2000mm carbon steel and neoprene seal, protected by epoxy cycle Supply, transport and...
  • By geminit
  • 4 Ottobre 2024

Belbrolo and Porto Mantovano floodgates

Belbrolo and Porto Mantovano floodgatesMain object of the work:Supply, transport and installation of No. 1 weir gate 18800x1300mm in carbon steel painted with epoxy cycle, sealed with Neoprene gaskets, equipped with sliding wheels and...
  • By geminit
  • 3 Ottobre 2024

Sluice gates AISI 316L Piazza San Marco Venice

Sluice gates AISI 316L Piazza San Marco VeniceMain object of the work:Supply and installation of no.1 flat floodgate 900x900mm 2.5m H2O in AISI316L complete with gargoyle, sill and mechanism-holding beam, threaded operating rods and...
  • By geminit
  • 3 Ottobre 2024

Gates desanding chambers Central Tel

Gates desanding chambers Central TelMain object of the work:Supply and installation of No.2 3000x4000mm 6m H2O sluice gates including No.2 gargoyles, sill and mechanism holders for sluice gates, threaded operating rods and gearbox drive...
  • By geminit
  • 3 Ottobre 2024

Fibbiana expansion tank sluice gates

Fibbiana expansion tank sluice gatesMain object of the work:Supply, transport and installation of 8 flat sluice gates 5000x2500mm H20 3m, bidirectional neoprene rubber seal with threaded screw actuation system, pair of reducers with connecting...
  • By geminit
  • 3 Ottobre 2024

Adjustment of hydraulic organs Gammauta Dam

Adjustment of hydraulic organs Gammauta DamMain object of the work:Modification of the 8500x4730mm sector sluice gates of the surface outlet such that they could be opened and closed by operation of hydraulic servomotors powered...
  • By geminit
  • 24 Settembre 2024

Countertop and Watertight Door

Counter and Watertight DoorSupply and installation of: N.1 Bench for turbine discharge tankNet height: 1500 mmNet width: 3500 mmSeal: four-sidedMaximum hydrostatic load: 2000 mm N.1 Bridge for dissipating valve discharge tankNet height: 1500 mmNet...
  • By geminit
  • 24 Settembre 2024

No. 4 benches 7.3 m x 1.5 m each

No. 4 benches 7.3 m x 1.5 m eachDesign, construction and installation of 4 stackable 7.3 m x 1.5 m benches each.The entire project was carried out with a full dock and therefore surveying,...